SEPLAT WA PHASE 2 AS-BUILT Project Overview

SEPLAT Western Assets Surface facilities in OMLs 4, 38 and 41 have undergone several modifications due to operational requirements, facility upgrades, and maintenance activities. As a result, there is a discrepancy between the documents available for the facility and what is on site. Since a large amount of information is required to safely operate and maintain COMPANY’s existing and new facilities, an update of information is required.

  • Client: Seplat Energies
  • Duration: 2 years
  • Project Type: Engr. & Project Management

The overall objective of this As-built effort is to generate multidiscipline engineering documentation/drawings that captures up-to-date status of the facilities to aid maintenance, operations, and further brownfield engineering modifications/Tie-ins of the facilities as required. NETCO Was contracted to conduct As-built site surveys for the following facilities:

OML 41

  • Sapele Flowstation
  • Ovhor Oil & Gas Manifold
  • Rapele Oil Manifold & LACT Unit

OML 4

  • Oben AG Compressor Station
  • Oben Gas Plant Expansion (Trains 1 -5)
  • Oben Gas Plant (Modules 1 & 2)
  • Oben NAG Booster Compressor Station

OML 38

  • Amukpe AG Compressor Station
  • Amukpe LTF
  • Amukpe Flowstation
  • Amukpe Buffer Tank + FW Facility
  • Amukpe Gathering Manifold